Building flexibility into subsea recovery
Integrated MDL winch systems expand vessel and spread options for complex decommissioning campaigns
Across mature offshore basins, subsea decommissioning is being pulled forward by ageing infrastructure, tightening regulatory expectations and rising cost pressure. At the same time, demand for offshore vessels remains high across energy sectors, pushing up day rates and limiting availability.
The North Sea Transition Authority's Cost and Performance Update for 2025 underlined a rising demand for cost-effective decommissioning tools to address the practical challenges operators face in turning decommissioning obligations into deliverable offshore campaigns. The report highlights rising costs, constrained offshore resources and a growing backlog - exposing a widening gap between planned obligations and actual delivery.
In this scenario, where there is no revenue upside to offset spend, the resulting commercial pressure is shaping how operators and installation contractors select, specify and manage their lifting and handling equipment requirements for decommissioning operations.
The right winch and recovery spread can reduce dependence on high-cost specialist vessels, improve campaign flexibility and help operators manage technical uncertainty during recovery.

Understanding the recovery challenge
The demands of decommissioning operations are fundamentally different from the installation campaigns for which most lifting equipment was originally designed. Recovered structures are often corroded, partially buried or heavily covered in marine growth, creating unpredictable loads and sudden breakout forces. Connection points may have degraded over time, adding further operational uncertainty.
Understanding these challenges is the first step towards addressing them. In these conditions, having the right tool for the job is as critical as having the capacity to execute it.
One of the most common technical challenges is the gap between rated winch capacity and performance under operational conditions. Winch line pull decreases across drum layers, meaning maximum rated pull is only achieved on the core of the drum. During decommissioning campaigns, where dynamic loading and heavy recoveries are common, this difference is operationally significant and can mean larger or differently specified winches are required to complete operations safely.
Rope integrity and maintenance standards are equally important. Equipment may have moved between multiple projects and operators, with varying levels of traceability and historical load data. In decommissioning operations, where equipment is often working near its limits, full certification, inspection history and proactive maintenance are critical to reducing operational risk.
More than the sum of the parts for complex jobs
As decommissioning campaigns move into deeper water and more complex recovery scopes, winches are increasingly specified as part of an integrated spread rather than standalone equipment.
MDL winch systems are engineered to work as part of a complete recovery spread from the onset - and that integration is where real operational value is delivered. When combined with MDL's wider spread capability, including our award-winning Wheeled Horizontal Lay System (WHLS), recovery capacity can be increased to match a high-capacity tensioner without additional space requirements or the weight of extra steel structures.

MDL's compact packages can temporarily convert standard support vessels into specialist solutions, even for deepwater deployment. By using modular, portable equipment, operators can move complex recovery scopes onto lower-cost tonnage, reducing vessel days and cutting overall project cost. Using tonnage available locally also contributes to reduced emissions on the scope from fuel burn for transit.
This is where portability and modularity become more than equipment features. Faster mobilisation, reduced transit and simpler deck integration can all help make a recovery campaign easier to plan and less costly to execute. For complex or unusual scopes, the same approach also allows the spread to be configured around the job, rather than forcing the job to fit a fixed system.
With over 25 years of experience supporting offshore operations worldwide, MDL combines in-house engineering, project management and offshore expertise to deliver integrated solutions purpose-built for complex decommissioning campaigns.
Learn more about how our winch systems, recovery spreads or project support can elevate your project on the Winches & Lifting Solutions page.
- October 2026Supporting Oceaneering SURF campaign off Egypt
- October 2026Embracing Norway's tieback opportunity
- October 2026MDL WHLS: pushing the vessel envelope
- September 2026Building flexibility into subsea recovery
- September 2026MDL Integrated Project Services enable Brazil deepwater decom