Newbuild Equipment Case Study

Shackle handling table

Safe solution for mooring piles installation

Challenge

An offshore contractor required a solution for safe handling of mooring chain on deck. The device had to be easy to move around for the required operations, while remaining securely in place once breaks were applied.


MDL Solution

MDL designed, modelled and engineered a bespoke handling table, followed by in-house manufacture and testing. The system was delivered on schedule complete with a documentation pack.


Outcomes

The table allows for manoeuvring of the shackle into place beneath mooring piles' pad eyes. This allows the shackle pin to be easily inserted, to ensure safe offshore installation of the pile.


<a href="https://player.vimeo.com/video/567248906">Your browser is set to not display iFrame content, try this link to view the video directly.</a>

From concept to operations support

Our comprehensive in-house skillset, long track record and decades of pipelay expertise allow us to design, engineer, manufacture, commission and integrate equipment tailored to your projects and targets.

Get in touch