West of Shetland return with i-Tech 7

MDL has completed a flexible installation project in the North Sea with i-Tech 7, Subsea 7’s Life of Field business unit – marking a return to the field two years after the original award.
The work scope – part of i-Tech 7’s inspection, repair and maintenance (IRM) campaign West of Shetland - consisted of a deployment of a jumper using an MDL horizontal spread. The 2-track pipelay tensioner, second-generation reel drive system, deck deflectors and an over-boarding chute were mobilised on the same offshore supply vessel (OSV) as in 2017.
Greig May, MDL Rental Projects Manager, said:
”This project is a great example of how a partnership approach between the different parties involved in a campaign can benefit the mission.
“Both i-Tech 7 and the end client were keen to replicate the MDL solution from two years prior, to reduce the costs associated with sea-fastening design, as the same vessel was being deployed on both projects.
“Prior experience and familiarity with the vessel, mobilisation port and project teams also facilitated efficient execution on MDL’s side, in terms of equipment and personnel scheduling, logistics and mobilisation.
“We hope to support i-Tech 7 on more projects in the future to further maximise the above benefits.”
Here is how the installation was carried out:
- janeiro 2023MDL AME delivers maintenance and training package for APAC
- janeiro 2023MDL upgraded tensioner drives SURF replacement
- novembro 2022Delivering electric duo for Brazil
- novembro 2022MDL spread carries out North Sea cable lay
- outubro 2022Entry 77299