Vessel Solutions Case Study

HLS Refurbishment

Overhaul of Horizontal Lay System

Challenge

An externally acquired horizontal lay system required a major overhaul to be fit for purpose. It showed significant corrosion, outdated modifications and structural deficiencies: welded grillage legs and davit arms had to be removed and the original chute was no longer suitable. Severely corroded hydraulics and fixings also needed full replacement to restore safe operation and reliability.


MDL Solution

MDL restored the asset’s structure and upgraded its systems. The Project Management & Engineering Team led fabrication of key components, including the new grillage, high-tension chute and trolley beams. MDL replaced all hydraulics and electrics and the unit was modified for multiple tensioned setups and integrated with a hang-off beam. A 4.5m chute was introduced to accommodate an increased MBR and handle a range of products.


Outcomes

The overhaul restored functionality and increased the system's capacity to 85Te. The upgraded asset featured a brand-new hydraulic system, modernised electrical panels and full hang-off beam integration. By repurposing the original chute as an overboarding chute, MDL maximised asset value, reduced waste and strengthened the capabilities of its own fleet.

We're here to find the answer to your maintenance challenges

Our in-house Project Management and Engineering expertise, supported by experienced onshore and offshore technicians, can help safely and efficiently extend the life of equipment on board your vessel fleet.

Get in touch