Rana performs pipelay with MDL
MDL has supported Italian underwater contractor Rana Diving in a rigid pipe installation in the Mediterranean.
MDL’s 2-track tensioner spread was mobilised onboard a moored barge – AD3 – to install 4km of 4” rigid pipeline off the east coast of Italy.
By using MDL’s portable technology, Rana was able to successfully perform the operation from their locally available vessel.
Riccardo Amato, Rana Installation Manager and Project Manager, said:
“Since the first contact, MDL was immediately very keen to give the required support, providing in a very short timeframe a solution suitable for our specific project.
“Office personnel was at all times available to support us during the whole process. Last but not the least, offshore personnel were very skilled, professional and always keen to work and provide support.
“MDL will remain our first point of contact.”
Alexander Wilson, MDL Flexlay Solutions Unit Lead, said:
“While we already have a strong track record in the Mediterranean, it’s always rewarding to contract with new clients on maiden projects.
“In this case, by supplying our proven technology, experienced field service personnel and engineering support, we helped Rana - a diving expert - to safely and confidently diversify their services into pipelay operations.
“On their part, Rana were able to perform the installation without the need for a specialist construction vessel or the involvement of an EPIC.
“I’m keen to explore how we can assist Rana and other forward-thinking companies like them in expanding their offering and maximising their expertise to pursue future success.”
- December 2024Asset acquisition grows Life of Field inventory
- December 2024Optimising spoolbase operations: future-proofing with innovative thinking
- November 2024Turning the tide on the global energy skills shortage
- November 2024MDL launches CMMS for predictable asset life support
- November 2024MDL expands Board with appointment of new directors